Homepage of amrs.at


Home for amrs.at

This site is hosted on an EHCP server, www.ehcp.net, ehcp is a hosting control panel for ubuntu,
To change this, Upload your files inside httpdocs folder using ftp (such as a program-filezilla or webftp)
The control panel for this server is probably here (http://109.230.239.156/ehcp) (ip:109.230.239.156)

Your local ip: 107.22.47.32